Senior Manager
Arcadis India Pvt Ltd
- Location
- India - Kolkata
- Education
- Bachelor's degree, Computers
- Experience
- 27 years, 5 Months
- Follow
- Block
- Report inappropriate
- Profile
- Activities
- Network
- Badges
Work experience
Total years of experience :27 years, 5 Months
Senior Manager at Arcadis India Pvt Ltd
- India - Kolkata
- April 2008 to May 2017
Overall responsible for QS/Projects in areas of MEP systems including developing process, standards, inspection procedures & evaluation tools in MEP matters.
Monitoring design development stages i.e. Schematic design to detail design to final design stage to freeze the final BOQ and budget for floating the tender.
The process followed by first stage Pre-Contract by floating of tenders with freezed tender drawings for selected pre-qualified vendors various round of technical and commercial interviews with vendors involves along with generating evaluation reports for management to understand on high price and low price items for further negotiate with vendors , for the services like 33/11/.44 Kva sub stn, WTP, STP, Vertical transportation, swimming pools and Water Bodies, Plumbing & Sanitary, Fire Fighting and detection, Boiler, DG's, BMS system and all other equipment and accessories related to the project. Awarding contracts LOI and LOA and mobilize contractor’s.
Once vendor mobilize, we have to deploy our billing and execution team to keep track on progress of work and payment to be made to maintain the cash flow of vendor.
Monitoring contractors & sub-contractors works on weekly basis and maintaining documents to evaluate calculation for EOT and LD’s to impose.
Controlling cost by keeping track on variations generating RVO’s for client approval after value engineering. Settlement of Final Account, calculation of Extension of Time (EOT) and Liquidity Damages (LD), Project documentation with contractors & subcontractors Coordinate with all MEP discipline, Contractor's engineering staff, project consultants / and Engineer on all aspects of MEP work.
To supervise and monitor the preparation of co-ordination drawings to ensure that all services are incorporated and coordinated with each other and also with building structure architectural features and interior finishes.
To review the material submittals with samples for Electrical equipment, HVAC equipment, plumbing equipment, lighting equipment, field devices and other associated MEP materials received from the Sub contractor and ensure such submittals are complied with the approved project specification/standards.
Liaise & coordinate with planning Engineer on all aspects of program / sequence of activities and work progress. Monitor & timely advice the Project Manager / Project Engineers on any anticipated conflict / coordination problems.
Distribute detailed information, documents and regulations as applicable to all concerned parties and ensure their acknowledgement and adherence to its contents. Periodical inspection of site activities and any discrepancies noticed shall be brought to the notice of Project Manager for any remedial action.
Preparation of as built coordination drawings on completion of works in respective areas.
EXPERTISE IN PRE-& POST CONTRACT ACTIVITIES TILL FINAL ACCOUNT OF CONTRACT LIKE:
Pre-Contract High Rise residential, Star Hotel and Commercial Projects:
Cost Appraisals
Cost Plans
Budgeting & Value Engineering.
Selection of contractors after Prequalification for tendering.
Preparing tender documents & BOQ’s to float
Floating tenders
Evaluations of submission and selection of vendor for next round.
Negotiations with contractors on Commercial & Technical issues
Awarding of contracts, preparing LOA / LOI’s
Post Contract High Rise residential, Star Hotel and Commercial Projects:
Preparing certification formats for different contractors as per respective contract.
Keeping track on variations due to change in drawings as per site conditions and statutory requirement.
Preparing formats for RFI’s and Variation Orders to be approved by client.
Keeping track on Material advance and recovery for ON-SITE material to be claimed by the contractor.
Final account settlement for various contractors after the completion of job as per contract. Participated in below projects during my tenure.
at Ispat Profile (India) Ltd
- January 1996 to January 2011
Worked in shifts, handled 220 Kv substation, Stack system, Steel Melting Shop (SMS) and in universal Rolling Mill stationed at Pune Sanaswadi .
Senior Manger Projects at Taneja Vidyut Control Pvt Ltd
- January 2007 to January 2011
Project in charge for installation of 33/11 Kv substation and services, like HT/LT electrical installations for mass housing project in Kolkata, project management procedures associated with Site Development, initiating, planning, execution, Equipment Installation, Final Restoration and closing. Corrective or preventive actions are taken to control the project performance
Manager at Engineering Services
- Egypt
- January 2005 to January 2008
In charge for Electro-Mechanical services Designing, execution, maintenance & Operations, of electrical installations for distribution, making layout plan for electrical equipment’s, selection of switch gears, cable selections, calculations and distribution, Taking care of Installation, execution and AMC's control for WTP, STP, Plumbing, Fire Fighting, Swimming Pools etc
Graduate Trainee Engineer
- January 1990 to January 2008
at Tandon Metal Pvt Ltd
- January 2005 to January 2007
Maintenance & Operation in charge for all electro-mechanical equipment in the factory like furnaces, substation, instrumentation and mechanical pipe line
Manager Engineering
- January 2003 to January 2004
Electrical Engineer at Hanil Era Textile Ltd
- January 1996 to January 2003
Taken part in installation of 2 X 5MVA HFO based power plant with the team of Watrsila Diesel (Finland) at Patalganga Raigad Maharashtra
Senior Manager
- January 2017 to
Project Scheduling skills
5.Man management
6.Contracts & Sub contracts
7. liaising with authorities
Summary
Single point interface with Client starting from pre-tender, tender, post tender and entire Project Life Cycle including close out.
Excellent man management, techno-commercial, and negotiation skills. Actively involved in liaising with authorities for various type of licenses and approvals.
Proven skills in contracts and subcontracts, Tendering, Budgeting, Cost Mgmt, Evaluation, Reporting, and interfacing with external con tractors and suppliers to organize the phases of the construction.
Proficient in evolving systems / procedures for change management in MEP project operations entailing mapping business processes and studying workflow to designing / installation and commissioning of solutions.
A persuasive and influential leader with nearly 23 years of impressive success in MEP Operations, Project Management, E&M/ HVAC / ACMV/ Facility Management, supervised successful installation & commissioning of various electro mechanical projects at various locations such as Hotels, Hospitals, High Rise Buildings, Palaces, Commercials & Residential Villa Complexes.
A keen planner, skilled in achieving timely project completion, profit & business growth objectives and turnaround for increase in top line and bottom line in rapid change environment
Expert in evolving systems / procedures for change management in MEP project operations entailing mapping business processes and studying workflow
Demonstrated excellence in interfacing with Engineers, Architects, Project Managers, Inspectors, Auditors, Authorities and other team members associated with a project. A visionary professional honed with ability to handle the project right from the scratch and ensuring successful completion of the same
Education
Bachelor's degree, Computers
- at DATAPRO
- January 2012
High school or equivalent, Engineer
- at Institute of Engineers Indi
- January 2008
High school or equivalent,
- at Institute of Engineers Indi
- January 2007
High school or equivalent, Engineer
- at DATAPRO
- January 2001
Specialties & Skills
Account Finalization
+Endorse0
Billing
+Endorse0
Tendering
+Endorse0
Contracts
+Endorse0
MEP
+Endorse0
MILL
+Endorse0
SMS
+Endorse0
CABLING
+Endorse0
CLOSING
+Endorse0
DESIGN
+Endorse0
LAYOUT DESIGN
+Endorse0
MECHANICAL
+Endorse0
PLUMBING
+Endorse0
PROJECT MANAGEMENT
+Endorse0
SWITCHES
+Endorse0
Filter
- All
- Questions
- Answers